Complete
No mentions found
This entity hasn't been tracked yet, or Iris is still building its knowledge base.
Related Articles from SNS
Done, But Not Sure: Disentangling World Completion from Self-Termination in Embodied Agents
arXiv:2605.08747v4 Announce Type: replace Abstract: Standard embodied evaluations do not independently score whether an agent correctly commits to task completion at episode closure, a capacity we call terminal commitment. Behaviorally distinct failures--never completing the task, completing it but failing to stop, and reporting success without sufficient evidence--collapse into the same benchmark failure. We introduce VIGIL, an evaluation framework that makes terminal commitment...
Mourinho to fly to Madrid to complete Real return
Jose Mourinho to Real Madrid: Former Chelsea boss flying to Madrid to complete deal to replace Alvaro Arbeloa on three-year contract Jose Mourinho will fly to Spain on Wednesday afternoon to complete a return to Real Madrid; Mourinho is set to sign a three-year deal; Benfica have announced that they are replacing the 63-year-old with former Fulham boss Marco Silva Wednesday 10 June 2026 08:57, UK Jose Mourinho will fly from Lisbon to Madrid this afternoon to complete his return to Spanish...
Monthly property transactions completed in the UK with value of £40,000 or above
Monthly property transactions completed in the UK with value of £40,000 or above This series looks at monthly property transactions completed in the UK with value of £40,000 or above. Documents Details These National Statistics provide monthly estimates of the number of residential and non-residential property transactions in the UK and its constituent countries. National Statistics are accredited official statistics.
Lifesaving prison fire safety work won’t be complete until early 2030s, inquiry told
Lifesaving prison fire safety work won’t be complete until early 2030s, inquiry told Prison chiefs admitted 19,000 prisoners are still held in cells which do not meet legal fire safety standards - Bookmark Vital measures to improve prison fire safety will not be completed until the early 2030s, an inquiry has been told, after the government U-turned on a pledge over the lifesaving changes. Ministers had promised to install automatic fire detectors (AFDs) in all cells in England and Wales by...
PIP administrative exercise for MM: completion report at 17 November 2025
PIP administrative exercise for MM: completion report at 17 November 2025 This publication presents DWP management information on completion of a review of PIP cases, potentially affected by the Supreme Court judgment MM. The Supreme Court judgment known as MM changed the way the Department for Work and Pensions (DWP) considers the definition of ‘social support’ when engaging with other people face to face (and when ‘prompting’ should be considered ‘social support’) in Daily Living Activity...
Minimum Complete MR Subsets under Semantic-Mutation Fault Models: A Support-Set Domination Boundary
arXiv:2606.08269v1 Announce Type: new Abstract: This paper asks when MR-subset selection is a real mutant-level requirement for minimum complete evidence in metamorphic testing rather than a coarse fault-class counting artifact. We define a layer-relative completeness criterion over an admitted mutant--draw coverage universe. The central result is a support-set domination boundary: it states when class-level abstraction is safe and when mutant-level MR minimization is necessary.
I2PRef: Image-Driven Point Completion with Iterative Refinement
Announce Type: replace Abstract: We present an image-conditioned point cloud completion approach that treats images as the primary geometric source rather than a secondary guide. To this end, we introduce an Image-to-Point (I2P) module that can reconstruct complete point clouds directly from a single RGB image, with no need for 3D inputs. Additionally, we introduce a transformer-based Point-to-Point (P2P) refinement module that uses self- and cross-attention between point tokens and image...
Trump says Reflecting Pool project is complete, but basin remains empty
Trump says Reflecting Pool project is complete, but basin remains empty Trump stated the work to paint the shallow basin a deep ‘American flag blue’ was finished on Wednesday - Bookmark - CommentsGo to comments The Lincoln Memorial Reflecting Pool has completed its renovation under Donald Trump's administration and is slated to be filled with water in the coming days. While Trump stated the work to paint the shallow basin a deep "American flag blue" was finished on Wednesday, and a court...
US to complete Trump's long-promised Mexico border wall by late 2027
US to complete Trump's long-promised Mexico border wall by late 2027 The United States expects to complete construction of President Donald Trump's long-promised southern border wall by late 2027, Customs and Border Protection Commissioner Rodney Scott said on Tuesday. Speaking at an event in Washington, Scott said the reinforced barrier would extend along most of the US-Mexico border, with limited exceptions where officials deemed it unnecessary.
Latent Structural Categorical Matrix Completion with Application to Quasispecies Analysis
Announce Type: cross Abstract: Matrix completion has been extensively studied for real-valued data, but existing methods are often limited in handling categorical variables. We propose LCMC, a double-loop optimization framework for categorical matrix completion via latent factorization based on a binary tensor representation. In this setting, each categorical entry is encoded as a one-hot vector along a third tensor mode, thereby preserving its discrete, non-ordinal nature.