Home Knowledge Base Duan

Duan

No mentions found

This entity hasn't been tracked yet, or Iris is still building its knowledge base.

Related Articles from SNS

Workers ruminate on the 'Boag's ghost' as brewery reaches end of life

Boag's brewery workers call last drinks on long history in Tasmania's north Sat 6 Jun 2026 at 8:26am Beer is not a spirit, but it can become a ghost. Just ask the workers at Boag's renowned Tasmanian brewery, which is now nearing the end of its own life, and was once allegedly haunted by a spectre that some say could be occasionally glimpsed throughout its halls. Beer is always good for loosening the tongue, and the story of the Boag's ghost is one of many tales upon which the brewers have...

ABC Australia 4d ago

Deterministic Monotone Min-Plus Product and Convolution

arXiv:2605.07150v2 Announce Type: replace Abstract: The Monotone Min-Plus Product problem is a useful primitive that has seen many algorithmic applications over the past decade. In this problem, we are given two $n\times n$ integer matrices $A$ and $B$, where each row of $B$ is a monotone non-decreasing sequence of integers from $\{1,\dots,n\}$, and the goal is to compute their Min-Plus product, defined as the $n\times n$ matrix $C$ with $C_{i,j} = \min_{k}\{A_{i,k} + B_{k,j}\}$. The fastest...

arXiv CS 9d ago

Multi-task Linear Regression without Eigenvalue Lower Bounds: Adaptivity, Robustness, and Safety

arXiv:2605.17126v2 Announce Type: replace-cross Abstract: We study the multi-task linear regression problem in the presence of contaminated tasks. We address the setting where the unknown parameters of a majority of tasks are close in the $\ell_2$-norm, while a fraction of tasks are arbitrary outliers. Existing theoretical frameworks for this problem rely heavily on the assumption that the empirical second moment of each task has a minimum eigenvalue bounded away from zero (order $\Omega(1)$).

arXiv CS 9d ago